PHP 8.4.1 Released!

IntlCalendar::roll

(PHP 5 >= 5.5.0, PHP 7, PHP 8, PECL >= 3.0.0a1)

IntlCalendar::rollAdd value to field without carrying into more significant fields

Beschreibung

Objektorientierter Stil

public IntlCalendar::roll(int $field, int|bool $value): bool

Prozeduraler Stil

intlcal_roll(IntlCalendar $calendar, int $field, int|bool $value): bool

Adds a (signed) amount to a field. The difference with respect to IntlCalendar::add() is that when the field value overflows, it does not carry into more significant fields.

Parameter-Liste

calendar

Eine IntlCalendar-Instanz.

field

One of the IntlCalendar date/time field constants. These are integer values between 0 and IntlCalendar::FIELD_COUNT.

value

The (signed) amount to add to the field, true for rolling up (adding 1), or false for rolling down (subtracting 1).

Rückgabewerte

Returns true on success or false on failure.

Beispiele

Beispiel #1 IntlCalendar::roll()

<?php
ini_set
('date.timezone', 'Europe/Lisbon');
ini_set('intl.default_locale', 'pt_PT');

$cal = new IntlGregorianCalendar(2013, 5 /* June */, 30);

$cal->add(IntlCalendar::FIELD_DAY_OF_MONTH, 1);
var_dump(IntlDateFormatter::formatObject($cal)); // "01/07/2013, 00:00:00"

$cal->set(2013, 5 /* June */, 30);
$cal->roll(IntlCalendar::FIELD_DAY_OF_MONTH, true); // roll up, same as rolling +1
var_dump(IntlDateFormatter::formatObject($cal)); // "01/06/2013, 00:00:00"

Das oben gezeigte Beispiel erzeugt folgende Ausgabe:

string(20) "01/07/2013, 00:00:00"
string(20) "01/06/2013, 00:00:00"

Siehe auch

add a note

User Contributed Notes

There are no user contributed notes for this page.
To Top